
CÔTE D’IVOIRE
DIDIEVI PROJECT
The Didievi Project Overview
The Didievi Project is strategically located in central Côte d'Ivoire, approximately 35km from the capital, Yamoussoukro, and 60km from operating low-grade mines. Alongside the primary resource zone at Didievi, there are several additional prospects that further enhance the potential for Didievi to evolve into a multi-million-ounce gold project.
Maiden Resource
During 2024, African Gold announced a shallow, high-grade Maiden Inferred Resource for the Blaffo Guetto prospect within the Didievi Project.
Based on a new geological model derived from recent geological logging and mapping, the resource totals 4.93Mt at 2.9 g/t gold, representing 452,000oz of gold (using a 1.0 g/t Au cut-off). On October 15 2024, African Gold reported outstanding drilling results from the Didievi Project, including 65.0m at 5.6 g/t Au from 177m and 155m at 1.1 g/t Au with a notable interval of 52m at 2.9 g/t Au from 178m.
Drilling Highlights
Previous drilling on Blaffo Guetto has produced exceptional shallow intercepts on the Blaffo Guetto prospect, including:
65.0m at 5.6 g/t Au from 177m including 22m at 10.9 g/t Au (ASX October 15 2024, DDD049)
155m at 1.1 g/t Au from 105m including 52m at 2.9 g/t Au from 178m (ASX January 30 2025, DDD053)
31.4m at 3.5 g/t Au from 250m including 18m at 5.6 g/t Au from 252m (ASX January 30 2025, DDD061)
10.0m at 123.7 g/t Au from 66m including 2m at 613.1 g/t Au (ASX 2021 8 September 2021, DRC334)
83.3m at 3.3 g/t Au from 166.9m including 18.0m at 12 g/t Au (ASX 2021 8 September 2021, DDD001)
17.4m at 17.0 g/t Au from 244m including 1.0m at 216.0 g/t Au (ASX 2021 8 September 2021, DDD029)
89.0m at 3.0 g/t Au from 0m including 23.0m at 9.5 g/t Au (ASX 2020 27 November 2020, DDD013)
43.0m at 4.3 g/t Au from 57 m including 17.0m at 9.5 g/t Au (ASX 2020 27 November 2020, DRC130)
69.0m at 2.9 g/t Au from 31m including 37.0m at 4.9 g/t Au (ASX 2020 27 November 2020, DRC138)
37.0m at 7.7 g/t Au from 42m including 24m at 11.0 g/t Au (ASX 2020 27 November 2020, DRC208)
Next Steps:
10,000m Drilling Program We are currently executing an aggressive drilling program, with an expected completion date of April 2025.
Resource Update Following the drilling program, we anticipate a major resource update, with a targeted goal of 1Moz+ by mid-2025
SUBSCRIBE TO OUR INVESTOR NEWS
Subscribe for news, webinars and important dates